Every project follows the same meticulous steps: from the initial meeting to a fully operational swimming pool. Below, you can see exactly how we work together to turn a swimming requirement into a swimming facility, including the average time required for each phase.
Procedure
A phased approach to creating additional swimming areas
A phased process with clear decision points and bespoke support, from the initial meeting to a fully operational swimming pool.
Phase 1 – Preparation and decision-making
Step 01
Initial consultation
An introduction and the first questions about your swimming enquiry.
Step 02
Needs analysis
Identifying target groups, capacity and specific objectives.
Step 03
Stakeholders
Coordination with local authorities, schools and organisations.
Step 04
Draft proposal
Configuration (Swimcube or Swimclad) and an indicative formula.
Step 05
Feasibility
Budget, support and the procedure to be followed.
Phase 2 – Implementation and operation
Step 06
Preparation and implementation
Location, engineering, construction, filling and testing by Swimwise Pools.
Step 07
Commissioning and operation
Self-management, or support from Swimwise Club.
Lead time
How much quicker is this than traditional swimming pool construction?
The same meticulous preparation as any infrastructure project, but with a significantly shorter construction and implementation phase.
Swimwise
from 4 months
Extensive refurbishment
1–2 years
New swimming pool construction
5–6 years or more
Swimwise
from 4 months
Extensive refurbishment
1–2 years
New swimming pool construction
5–6 years or more
Timeframes are indicative and depend on decision-making, procedures, configuration and site preparation.
Technology
Could a swimming pool like this be installed at your venue?
Six basic requirements that we assess together during a technical site survey. No two sites are the same, which is why every project begins with an on-site survey.
Ground and space
Flat, stable and load-bearing, with space for the unit and technical areas.
Accessibility and installation
Safe access for trailers, freight transport and installation equipment.
Water and drainage
A suitable water supply and an approved drainage point.
Electricity and technology
Equipment for water treatment, pumps and climate control.
Safe traffic flow
Routes for users, staff, deliveries and emergency services.
Accessibility and surroundings
People with disabilities, cycling, parking, and drop-offs and pick-ups.
Case
How Mechelen made swimming water more accessible
Mechelen was struggling with outdated swimming pool facilities and long waiting lists for swimming lessons.
This is a familiar picture in many municipalities: school swimming lessons under pressure, renovations that take years, and children having to travel a long way for just half an hour in the water.
first pool operational 180 days after initial contact
Frequently Asked Questions
Questions about the process
The most frequently asked questions from school boards and schools regarding approach, timing, licences and operation.
Are permits required?
Depending on the country, location, duration of use and configuration. We will assist with the coordination with the relevant authorities.
How much does it cost and how long does it take?
We determine the price and lead time on a case-by-case basis, depending on the concept, capacity, location, duration and services provided.
Manage it yourself or let us take care of it?
Purchase and long-term lease with in-house management, or an all-inclusive package with full swimming pool operations managed by Swimwise Club.
Who is responsible for operation and maintenance?
Maintenance, water monitoring, cleaning, supervision and swimming lessons are allocated or included in accordance with the chosen package.
Getting started
Ready for step 1?
Book an exploratory meeting and we’ll discuss your swimming requirements, potential locations and the appropriate Swimwise configuration, with no obligation. From the initial meeting to your first swimmer, with a single point of contact.